RECERTIFICATION

A detailed recertification and inspection are required periodically by the manufacturer or certified distributor. This period shall not exceed 12 months and is recommended every 6 months under high use.

A good practice it to rectify your restraints at the same time the iron is obligated for re-certification and inspection. The recertification will include a thorough visual inspection and load testing using a hydraulic pull testing bed.

DIRECT

1 (403) 880 – 4384

PHONE

1 (587) 471 – 6984

EMAIL

dan@canyonrigging.com

FREE QUOTE

Do you need help with your project?

Fill out this form to get in touch.